Project background

An open site in the rural New Territories is proposed as a private car park, mainly for private cars. A three-year temporary use is being considered, with a consultant preparing the planning information. The formal use, application category and documents must be confirmed for the site.

Key questions

Vehicles must be able to enter and leave safely

The number of spaces is not the only consideration. Explain vehicle types, bay dimensions, aisles, turning and road connections, without squeezing circulation space to increase capacity. Commercial vehicles, busy entrances or nearby junctions may require different traffic information.

Drainage and site levels affect one another

Paving and filling may alter stormwater flows. Understand existing channels, level differences and flood conditions. Reliable previous plans and surveys can be used first; add levels and drainage proposals where information is missing or no longer matches the site.

Check access and drainage rights separately

Owning the site does not mean you have vehicle access rights to reach it. Where access or drainage connections cross third-party land, establish the basis for using it. Distinguish the views of village representatives, adjoining owners and residents from their actual land rights.

Planning route

  1. Establish what the car park actually includes

    Check the current plan, previous approvals and operating arrangements. Distinguish ordinary parking from storage of vehicles for sale, repairs, washing or cargo handling. These activities cannot all be treated as an ordinary car park.

  2. Prepare the layout and first-submission information

    If an application is required, prepare location and site-boundary plans, layout and access plans, the application form, agent's authorization and applicable owner-consent or notification documents. Include technical information already confirmed as necessary for the first submission; do not assume it can wait for a departmental letter.

  3. Refine the scheme around traffic and drainage issues

    Determine supplementary information from road conditions, vehicle movements and stormwater discharge. If charging facilities are proposed, show their location on the layout and check the relevant restrictions. The owner arranges electricity supply, electrical works and private rights separately.

The route depends on the site, available records and applicable statutory plan.

Information to prepare

  • Parking capacity, vehicle types, layout, turning and operating hours
  • Entrances, connecting roads and information on access rights
  • Paving, drainage, filling and site photographs
  • Land lease, tenancy, previous permissions and approval conditions

Key takeaway

Establish whether the use, access and drainage are feasible before calculating parking capacity. Planning permission does not itself grant rights to use third-party land.

The service covers planning permission and planning review for licensing. Construction, electricity connections and private rights require separate arrangements where relevant.